5. Drainage piping work
Outdoor unit drainage pipe connection
6. Electrical work
6.1. Caution
1
2
3
4
5
6
7
<PUMY-SP·VKM>
L N
B1 B2
M1
TB1
TB3
C
A
B
<PUMY-SP·YKM>
L1 L2 L3 N
B1 B2
TB1
TB1B
B
C
A
A
B
C
D
Fig. 6-1
E
M2
S
M1
M2
S
F
TB7
D
E
M1
M2
S
M1
M2
S
F
TB3
TB7
D
E
F
8
9
0
1
2
6.2. Control box and connecting position of wiring
(Fig. 6-1)
F
E
Caution:
Never connect the transmission line for the indoor unit or the centralized control
system transmission line to this terminal block (TB1B). If the transmission
lines are connected, the indoor unit or centralized control could be damaged.
en
14