Drainage Piping Work; Electrical Work; Control Box And Connecting Position Of Wiring - Mitsubishi Electric CITY MULTI Para El Instalador

Ocultar thumbs Ver también para CITY MULTI:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 98

5. Drainage piping work

Outdoor unit drainage pipe connection

6. Electrical work

6.1. Caution
1
2
3
4
5
6
7
<PUMY-SP·VKM>
L N
B1 B2
M1
TB1
TB3
C
A
B
<PUMY-SP·YKM>
L1 L2 L3 N
B1 B2
TB1
TB1B
B
C
A
A
B
C
D
Fig. 6-1
E
M2
S
M1
M2
S
F
TB7
D
E
M1
M2
S
M1
M2
S
F
TB3
TB7
D
E
F
8
9
0
1
2

6.2. Control box and connecting position of wiring

(Fig. 6-1)
F
E
Caution:
Never connect the transmission line for the indoor unit or the centralized control
system transmission line to this terminal block (TB1B). If the transmission
lines are connected, the indoor unit or centralized control could be damaged.
en
14

Hide quick links:

Tabla de contenido
loading

Tabla de contenido