Before Entering The Workplace; Configuration - Dräger X-am 5100 Instrucciones De Uso

Ocultar thumbs Ver también para X-am 5100:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42
Before the instrument is switched off, the visual, audible and
vibration alarms are activated for a short time.
3.1.5

Before entering the workplace

WARNING
!
Before any measurements relevant to safety are made, check
the adjustment with a bump test, adjust if necessary and
check all alarm elements. If national regulations apply,
a bump test must be performed according to the national
regulations. Faulty adjustment may result in incorrect
measuring results, with possible serious consequences.
1. Switch on the instrument. The current measured values are shown
in the display.
Observe any warning »
The instrument can be operated normally. If the warning
message does not disappear automatically during operation,
the instrument must be serviced after the end of use.
The instrument is not ready to measure and requires
maintenance.
2. Check that the gas inlet opening on the instrument is not covered.
WARNING
!
Explosion hazard! To reduce the risk of flammable or
explosive atmospheres igniting, it is essential that the
warning notices below are observed:
In an oxygen enriched atmosphere (>21 Vol.-% O
explosion protection cannot be guaranteed; remove
instrument from the Ex area.
High values outside the display area indicate an
explosive concentration where applicable.
Dräger X-am 5100
« or fault messages »
«.
3.2

Configuration

NOTICE
i
i
Only trained personnel are permitted to make changes to the
device configuration.
To customise its configuration, the instrument must be connected to
a PC with the USB-DIRA adapter (Order No.
The Dräger CC-Vision PC software is used to perform the
configuration.
Changing the configuration: see the Technical Handbook.
Standard instrument configuration
Dräger X-am 5100
Bump test mode
Fresh air adjustment
Operating signal LED
Horn operating signal
Disabling
Averaging time
1
At least one of the two operating signals must be switched on.
), the
2
1
Different settings can be selected to meet customer requirements on
delivery. The current setting can be checked and changed with the Dräger
CC Vision software.
1
Off
On
Yes / No
1
Yes / No
1
permitted / blocked for A2
15 minutes for STEL
8 hours for TWA
Use
83 17 409).
21
Tabla de contenido
loading

Este manual también es adecuado para:

Mqg 0020

Tabla de contenido