Small work
First make a shallow marking cut, max 50-70 mm (2-3
inches) in depth. Now make the final cut.
Cutting holes
NOTICE! If the upper horizontal cut is made before the
lower horizontal cut, the work piece will fall on the blade
and jam it.
•
First make the lower horizontal cut. Now make the two
vertical cuts. Finish with the upper horizontal cut.
2
Remember to divide the blocks up into manageable
pieces so that they can be transported and lifted safely.
•
When cutting out large holes it is important that the
piece to be cut out is braced so that it cannot fall
against the operator.
20 – English
OPERATING
3
2
1
Transport and storage
•
Secure the equipment during transportation in order
to avoid transport damage and accidents.
•
For transport and storage of Blades, see the section
"Blades".
•
Store the equipment in a lockable area so that it is out
of reach of children and unauthorized persons.