cecotec AIRCLIMA 9000 SMARTFRESH Manual De Instrucciones página 103

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 44
ENGLISH
1. Drainage ports
Step 6. Connect the cable. Fig. 13
6.1 Choose the appropriate cable size determined by the maximum operating current given on
the rating plate. (Check the size of the cables, see INSTALLATION PRECAUTIONS section).
6.2 Open the front panel of the indoor unit.
6.3 Using a screwdriver, open the cover of the electrical control box, to reveal the terminal
block.
6.4 Unscrew the cable clamp.
6.5 Insert one end of the cable into the control box position from the back of the right end of
the indoor unit.
6.6 Connect the wires to the appropriate terminal according to the wiring diagram on the
cover of the electrical control box. Make sure they are properly connected.
6.7 Screw on the cable clamp to secure the cables.
6.8 Reinstall the electrical control box cover and front panel.
Fig. 13 key:
1. Front panel
2. Wiring diagram
3. Control box cover
Step 7. Wrap the tubes and cable
Once the refrigerant pipes, connecting cables and drain hose have been installed, to save
space, protect and insulate them, they should be tied with insulating tape before passing
them through the hole in the wall.
7.1 Arrange the pipes, cables and drainage hoses, as well as figure 14.
NOTE:
(I) Make sure that the drain hose is at the bottom.
(II) Avoid crossing and bending the pieces.
7.2 Wrap the coolant pipes, connecting cables and drain hose tightly with the insulating tape.
Fig. 15
Fig. 14 key:
1. Connection cord
2. Electrical tape
3. Coolant piping
4. Draining hose
103
AIRCLIMA 9000 SMARTFRESH/ AIRCLIMA 12000 SMARTFRESH/ AIRCLIMA 18000 SMARTFRES/
AIRCLIMA 24000 SMARTFRESH/ AIRCLIMA 12000 SMARTFRESH CONNECTED
loading