Connecting The Cable Assembly; Setting The Shielding Gas Volume - Abicor Binzel MB EVO PRO Serie Instructivo De Servicio

Ocultar thumbs Ver también para MB EVO PRO Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

MB EVO PRO/MB EVO

4.2 Connecting the cable assembly

Fig. 9
Connecting the cable assembly

4.3 Setting the shielding gas volume

C
B
1 Mount the shielding gas and control lead connectors correctly.
NOTICE
• Check the minimum fill level on the cooling unit.
• Ensure that the coolant supply and return hoses have been correctly
installed. Coolant supply = blue, coolant return = red.
• Do not use deionised or demineralised water as coolant or for leak and
flow tests. This may shorten your welding torch's service life.
• For fluid-cooled MIG/MAG welding torches, we recommend using
ABICOR BINZEL BTC-15 coolant.
• The cooling system must be purged of any air each time the device is
commissioned and after every cable assembly change: disconnect the
coolant return hose from the coolant recirculator and hold it over a
collection receptacle. Close the opening on the coolant return hose. Then
re-open it by abruptly releasing it. Repeat until the coolant flows into the
collection receptacle continuously and without air bubbles.
NOTICE
• The type and amount of shielding gas used depend on the welding task
and the gas nozzle geometry.
• Make all shielding gas connections gas-tight.
• To prevent the shielding gas supply from becoming clogged by
impurities, the cylinder valve must be opened briefly before connecting
the cylinder. This will expel any impurities that may be present.
4 Putting into operation
A
EN - 11
Tabla de contenido
loading

Este manual también es adecuado para:

Mb evo serie

Tabla de contenido