ECOFOREST HC 2014 Manual De Instalación Y Mantenimiento página 35

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Stainless steel hose clamp.
Wooden ground.
Non flammable floor protection.
Stainless steel flexible tube.
Rigid flexible pole adapter.
Minimum 200mm.
It must exceed roof height by 1 metre.
If the tube over 4 m in length, the next larger
size will be used.
4.26. Installing a fitted boiler in a brickwork chimney can be done using flexible piping in its entirety, as indicated in
drawing 7. We must take special care when sealing the chimney and gas venting to avoid gas blowing back
during storms.
Stainless steel hose clamp.
T of 135° with outlet.
Elbow of 45°.
Wooden ground.
Non flammable floor protection.
Stainless steel flexible tube.
Rigid flexible pole adapter.
Anti blow-back seal.
Minimum 200mm.
It must exceed roof height by 1 metre.
If the tube over 4 m in length, the next larger
size will be used.
When installing a flexible tube for gas outlet, be careful that this is not in contact or close to the circuit board
or combustible material.
Hereunder are detailed the stops to follow in order to drain the boiler as well as the recirculation pump;
please note however that this operation must be carried out by a specialized technician.
The purger is located in the upper part of the boiler exchanger, which can be accessed by opening the right
side door.
O The other piece to be drained is the circulation or acceleration pump – depending on the model, it is
provided either with a manual key or a screw, as shown on below drawing 8. To drain the pump, the same process as
for the steam trap is required.
HEATING SYSTEM DRAINING (VERY IMPORTANT).
34
Drawing 6
Drawing 7
Tabla de contenido
loading

Este manual también es adecuado para:

Hb 2014

Tabla de contenido