GARANT VG Basic pre-setting device
6
Measuring function over-
view
Tab. 2: Help and special functions
5.
Transport, place of erection
en
WARNING
Pre-setting device falling or tipping over
Crush hazards, laceration hazards and impact hazards for the body
and limbs.
» Use transport vehicles, hoists and lifting tackle designed to accept
the weight and size of the pre-setting device, and which satisfy
the requirements for safe transport.
» Note the tare weight of the pre-setting device.
» When the pre-setting device is lifted, do not walk beneath it or
reach beneath it.
» Avoid shaking, impacts and point loading on the housing.
» Do not use the monitor arm, tower, transport restraint or optical
unit as lifting points.
» When lifting the base unit, do not subject the tower to any tip-
ping or twisting movements.
If delivered on a pallet, perform transport to the place of erection on
the pallet using a suitable load carrying device.
Immediately on receipt check the product for damage in transport.
Damaged products must not be installed or commissioned.
5.1.
PLACE OF ERECTION
5.1.1.
Ambient conditions
Ambient temperature: +15 °C to +25 °C.
Do not expose to severe temperature fluctuations.
Store or erect the system indoors at a location dust-free, dry and
not exposed to sunlight, free from shaking and vibration.
Do not store or erect the system close to corrosive or aggressive
chemical substances, solvents, moisture or dirt.
Avoid exposure to direct sunlight.
5.1.2.
Remove the packaging material
i
Store the packaging material for any necessary disassembly, dis-
patch or storage.
1. Remove the cover of the wooden case, and also the four side
walls.
2. Unscrew the two retaining brackets from the pallet, and remove
the brackets.
3. Remove the restraining strap.
4. With assistance by a second person, lift the pre-setting device
and position it at the place of erection.
5.1.3.
Remove the transport restraint
A
i
Before initial commissioning remove the transport restraint and
store it for any necessary disassembly, dispatch or storage.
1. Using a hexagon key L-wrench size 3 mm, undo the screw on
the tower.
2. Remove the guard plate.
3. Screw the screw finger-tight into the tower.
6.
Commissioning
6.1.
CONNECTING THE
6.1.1.
power supply
B
i
Use only the power supply unit supplied.
1. Connect a low-power plug to the power supply unit.
2. Connect the low-voltage plug of the power supply unit to the
socket at the rear of the base body.
20
8 Keyboard
3. Connect the power plug to the electrical mains (110 - 230 V
voltage).
» Before commissioning, connect to the Compressed air supply
[} Page 20].
6.1.2.
Compressed air supply
C
1. Connect the source of compressed air via a compressed air hose
to the socket at the rear of the base body.
» A service unit (pre-set to 5 bar) is connected internally.
6.1.3.
Pneumatic connections (schematic)
X-axis drive nut
Main compressed air supply
(provided by the customer)
at least 4 bar
Fig. 5: Pneumatic connections
6.2.
SWITCHING ON
1. Switch on the main switch at the rear of the base body, and wait
10 seconds.
2. Keep the On/Off switch on the panel PC depressed for two to
three seconds.
» The panel PC will start up.
3. If the panel PC fails to start up, wait four to five seconds and
once again keep the On/Off switch on the panel PC depressed
for two to three seconds.
» The measurement software will start, note the Performing
movement to reference points/calibration [} Page 20].
6.3.
PERFORMING MOVEMENT TO REFERENCE POINTS/
CALIBRATION
i
Calibration is necessary in order to determine the offset values for
the adapter/calibration mandrel.
After every restart,
after changes to the parameters,
after changing the adapter.
ü Adapter/calibration mandrel inserted in the tool mounting.
1. In the measurement software, select or create the adapter/calib-
ration mandrel that was inserted.
Calibrate the adapter
2. Press
3. Release the locking of the quick adjustment, move the tower
and optical unit into position.
4. Use the infinite fine adjustment to move the camera to the posi-
tion of the calibration edge of the adapter.
Instruction manual
Z-axis drive nut
Valve
Internal service unit
Pneumatic connections
.
Handle