UNPACKING/ASSEMBLY
WARNING
Carry out the unpacking, assembly, lifting and installation operations described below
with care.
Failure to comply with these recommendations may damage the machine and put the
operator's safety at risk.
- Remove the top part of the cardboard packaging. Make sure that the machine has not
been damaged in transit, and identify the points at which it is anchored to the pallet
(2 fig. 1), ready to remove the machine.
- The machine comprises five main sections (fig.2a):
1. Body with pedal unit and turntable.
2. Column with bead breaking unit and tool arm.
3. Air tank (T.I. version only).
4. Wheel lift (Optional).
5. Bead presser (Optional).
- Remove the packaging from the air tank and/or any optional units, and place them in a
position where they cannot fall over and be damaged.
- Reassemble the tool drive cylinder D.20x400 as shown in figure 7a; the cylinder is
shipped strapped to the arm.
- Screw back on the bracket which supports the bead breaker drive unit (fig. 7b).
- Fit the wheel lift (fig. 7d) using the three screws.
- Connect the tank union to the air connection pipeline provided, securing it with a band
clamp. Secure the air tank to the machine using the bracket provided, with screws (A)
and nuts (B) (fig.2a) (T.I. version only).
- Position the drawer units and rear tool tray using the screws as shown in figure 7c.
To remove the machine from the pallet connect to it by means of the lifting bracket 1
provided, as shown in fig. 2.
This lifting point must be used whenever you need to change the installation position of
the machine. Do not attempt to move the machine until it has been disconnected from
the electricity and compressed air supply systems.
Operator's manual Artiglio 50
LIFTING/HANDLING
GB
47