Ascaso BIG DREAM T Manual De Usuario página 13

Idiomas disponibles

Idiomas disponibles

If these parameters are not met in mains water, a specific filtration device must be
installed, always complying with current national and local regulations regarding
drinking water.
Once the water inlet and drain connections have been made, we will open the valve or
tap to fill the boiler.
ATTENTION!
This equipment is to be installed with adequate backflow protection to comply
with applicable federal, state or local codes.
7 – Start-up
Set the main switch to the "ON" position and automatically the machine will proceed to
fill the boiler to the set level. Once the filling process has been completed, the water will
be heated up to the working temperature and pressure.
Pump pressure regulation:
The pump is factory-set to 9 bar
pressure. If it is necessary to
adjust it, please turn the pump
regulator placed under the
machine. Turning it clockwise will
increase pressure, and counter
clockwise will decrease it. Please
check pressure while adjusting on
manometer.
From this moment, it will be necessary to wait until the temperature of the coffee
groups reaches the set-point (showed in the specific display of each group dedicated
to the temperature and also in the main display) in order to start making coffee, and
until the temperature of the steam/hot water boiler (showed in the main display)
reaches the set-pint one (the pressure gauge will show a pressure between 1 and 1.5
bar depending on the set-point) in order to start using the hot water or steam function.
ATTENTION: During the heating up of the groups, the 5 keys of each control
panel will alternate to be ON and OFF until group reaches set temperature. Then
5 keys will change to permanent ON position.
13
loading