Operation; Daily Inspection - Jacobsen CG2 Serie Manual De Seguridad, Funcionamiento Y Mantenimiento

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

7

OPERATION

7.1

DAILY INSPECTION

1.
Perform a visual inspection of the entire unit, look for signs of wear, loose hardware and missing or
damaged components. Check for fuel and oil leaks to ensure connections are tight and hoses and
tubes are in good condition.
2.
Check the fuel supply, radiator coolant level, crankcase oil level and air cleaner is clean. All fluids
must be at the full mark with the engine cold.
3.
Make sure all cutting units are adjusted to the same height of cut.
4.
Check all tyres for proper inflation.
5.
Test the operator presence and safety interlock system.
SAFETY AND OPERATION & MAINTENANCE MANUAL
CAUTION
The daily inspection should be performed only
when the engine is off and all fluids are cold.
Lower implements to the ground, engage
parking brake, stop engine and remove ignition
key.
JACOBSEN FAIRWAY 305 Series CG2
en-21

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Cg2 fairway 305 turboJgpp010t

Tabla de contenido