4.3.4. Water draining from probe & injection point housing
IMPORTANT: When installing the probe & injection point housing, the installation
should ensure the probes remain wet, especially during the pump's off period.
If water is found to drain from pipework and especially from the probe and injection point housing, it is
possible that the probes may dry out. Should this occur, please refer to the troubleshooting section that covers
recovering dry probes. Where pipework is found to drain, the probe housing should be installed to allow a low
point, to keep water in the housing, ensuring the probe ends remain submerged (refer Figure 4.8).
4.3.5. Plumbing the probe & injection point housing to acid dosing pump
Following section 4.2.2, the acid (delivery) feeder tubing should be fitted to the delivery connection of the
pump (represented on the lid with s), and tightened with the locking nut.
IMPORTANT: Davey recommends ensuring that all feeder tubing and probe cables
be attached to pipework where possible. Use "cable ties" or "sticky/electrical tape".
This is good practice, not only as the installation looks more professional, but it also
limits potential damage to feeder tubes and probe cables by becoming entangled, or
pulled by users during servicing of equipment etc.