Configuration And Operation; Initial Start-Up; Controls - Kaco blueplanet 29.0TL3 Serie Manual

Ocultar thumbs Ver también para blueplanet 29.0TL3 Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

9 | Configuration and operation

9
Configuration and operation
9.1

Initial start-up

When started for the first time, the device displays the configuration assistant. It takes you through the
settings necessary for the initial start-up.
AVISO
After configuration is completed, the configuration assistant does not appear again when the device is
restarted. You can then change the country setting only in the password-protected parameter menu.
The other settings can still be changed in the Settings menu.
1. In order to select a setting, press the Up and Down buttons.
2. To select the next menu option, press the Enter button.
3. To return to the most recently selected menu option, press the ESC button.
4. Set the required settings.
5. In the last menu option, press the Enter button.
Configuration assistant
1. Select the menu language.
2. Select the country of operation with grid type.
3. Set the date and time.
4. To store the set operator country and grid type permanently, confirm with "Yes".
ð You have completed the initial configuration. The device begins operation.
9.2

Controls

The device has a backlit LCD display as well as three status LEDs. The device is operated using 6
buttons.
The 3 LEDs on the device control panel show the different operating states. The LEDs can display the
following states:
LED illuminated
Operating status
Start
Feed-in start
Feed-in operation
2
*) The waiting period ensures that the generator voltage continuously remains above the power deli-
very limit of 200 V. For country-specific waiting periods see our website.
Página 36
LED flashing
LED Icon
Display
Power fed into the grid or
measured values
Power fed into the grid or
measured values
Manual
LED not illuminated
Description
The green "Operation" LED is on
when the AC voltage is present, inde-
pendent of the DC voltage.
The green "Operating" LED is lit.
The green "Feed-in" LED is lit after
the country-specific waiting period
Ready for grid operation.
The interface switch engages audibly.
The green "Operating" LED is lit.
The green "Feed-in" LED is lit.
The "Feed-in" icon appears on the
LD display.
The device feeds into the grid.
Kaco blueplanet 29.0TL3
2
.
Tabla de contenido
loading

Tabla de contenido