Ebotics Arm Robot Manual Del Usuario página 50

Electronics and programming kit: arm robot and double joystick gamepad
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

STEP 3
Attach BASE2 with SERVO
motor to BASE1
Check that BASE2 is in the correct position with BASE1 (the
Servomotor rotor must be facing up).
• Join both bases with the M3/25 screws.
• Screw BASE1 nuts to securely attach the structure (F3_B).
Note: When inserting the screws into BASE2
make sure that the screws tips do not go
through the BASE2 surface (F3_A).
ARM ROBOT MANUAL
F3_A
F3_B
Result
50
Tabla de contenido
loading

Productos relacionados para Ebotics Arm Robot

Tabla de contenido