9 Maintenance and cleaning
9.4 Maintenance of the coolant shut-off valve
1
2 valves
2
2 pressure springs
3
2 set screws M8x8
Fig. 10
Maintenance of the coolant valve
EN - 20
5 Clean the separating point and grease O-rings with silicone-free sealing
grease.
6 Check the TCP after each use or after a collision in the alignment jig.
1
2
8
7
4
2 clamping screws M4x5
5
ABIROB
6
4 O-rings 7x1
1 Loosen the clamping screw (4).
2 Dismount valve (1).
3 Unscrew the set screw (3).
4 Dismount pressure spring (2) and valve ball (7). Clean valve ball (7) and
replace it if necessary.
5 Check the O-rings (6) for damage and replace them if necessary.
6 Re-insert valve ball (8) and pressure spring (2).
7 Screw set screw (3) again. In doing so, observe the maximum screw-down
depth (7).
8 Mount valve (1) and secure it with clamping screw (4), max. tightening
torque M = 2 Nm.
3
6
7
®
W cable assembly
8
ABIROB
4
5
max. screw-down depth
2 valve balls
®
W