Verlinde Stagemaker SL10 Manual Del Propietário página 119

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation
Factory installed
If you must add lubricant for the hoisting gear, see the following table for the correct fill amount.
Frame size
05
10
2 Chain
Lubricated with oil.
• Lubricate the chain carefully before the first run (commissioning).
◦ Apply a substantial amount of lubricant over the full length of the chain
◦ Make sure that the chain is lubricated all over its surface and links, especially on all contact
areas between the chain links.
• To extend the chain lifetime, continue to lubricate the chain within regular intervals.
• Chain lubrication interval varies from a minimum of one week to one year, depending on the
usage.
Standard lubricant
Installation
Lubricate before first run
Este documento y la información contenida en éste son de propiedad exclusiva de Verlinde S.A.S., constituyen un
secreto comercial no público, confidencial del propietario, y no puede ser ni reproducido, divulgado a terceros,
modificado ni empleado de ninguna otra manera sin el permiso expreso escrito de Verlinde S.A.S. Copyright 2020 ©
Verlinde S.A.S. Todos los derechos reservados.
Trade name and number
Mobil ATF 320
Quantity [l]
0.23
0.6
Trade name and number
Mobilgear 600 XP 220
MANUAL DEL PROPIETARIO
Quantity
Lubricated for the design working
period of the product
Quantity [pt]
0.49
1.27
Quantity
As required
3/2020
Tabla de contenido
loading

Productos relacionados para Verlinde Stagemaker SL10

Tabla de contenido