Installation
Factory installed
If you must add lubricant for the hoisting gear, see the following table for the correct fill amount.
Frame size
05
10
2 Chain
Lubricated with oil.
• Lubricate the chain carefully before the first run (commissioning).
◦ Apply a substantial amount of lubricant over the full length of the chain
◦ Make sure that the chain is lubricated all over its surface and links, especially on all contact
areas between the chain links.
• To extend the chain lifetime, continue to lubricate the chain within regular intervals.
• Chain lubrication interval varies from a minimum of one week to one year, depending on the
usage.
Standard lubricant
Installation
Lubricate before first run
Este documento y la información contenida en éste son de propiedad exclusiva de Verlinde S.A.S., constituyen un
secreto comercial no público, confidencial del propietario, y no puede ser ni reproducido, divulgado a terceros,
modificado ni empleado de ninguna otra manera sin el permiso expreso escrito de Verlinde S.A.S. Copyright 2020 ©
Verlinde S.A.S. Todos los derechos reservados.
Trade name and number
Mobil ATF 320
Quantity [l]
0.23
0.6
Trade name and number
Mobilgear 600 XP 220
MANUAL DEL PROPIETARIO
Quantity
Lubricated for the design working
period of the product
Quantity [pt]
0.49
1.27
Quantity
As required
3/2020