Beko OWAMAT 6 Instrucciones De Montaje Y De Uso página 16

Ocultar thumbs Ver también para OWAMAT 6:
Installation • Instalación
Installation • Instalação
Putting into operation • Puesta en marcha
Mise en service • Colocação em funcionamento
S
S
ÖWAMAT 6
m a x .
m i n .
16
S
S
ÖWAMAT 8
m a x .
m i n .
english
ÖWAMAT with heating (optional):
• Please follow the Instructions for
Installation and operation of
heating Systems supplied with
the ÖWAMAT.
• The electrical installation must
only be carried out by suitably
qualified
and
authorised
personnel!
Level indicator
Checking the free movement
• Open the lid
• Turn the lid
! The level indicator must come
out on account of its own
weight.
• Replace lidand screw down star grips
hand-tight.
1. Fill ÖWAMAT with clean water
• Open the lid.
• Let in the water through the hand-
hole: container and filter chamber
are filling up.
• Shut off the water when it starts to
come out at the water outlet.
2. Check oil outlet
• When the water is still, the
adjustment ring should lie 1 cm
above the water level (factory
setting).
• Close the lid.
The water level will sink due to the
gradual water intake of the filter.
• Fill up with clean water as required.
The ÖWAMAT is ready for opera-
tion:
! Discharge of condensate
The treated water may initially be
black for a short period (carbon dust).
This does not affect the function.
ÖWAMAT 6, 8
loading

Este manual también es adecuado para:

Owamat 8Onowamat 6Onowamat 8