Genie Directlift 2060 Manual De Funcionamiento Y Mantenimiento página 6

Ocultar thumbs Ver también para Directlift 2060:
2060-3060
eng.qxd
11/9/05
11:02
AM
Page
6
Measure garage door height (7'-6", 8'-0", or taller) with
tape measure.
A
If door height is 7'-6" or less, continue
with Check Step 4.
B
If door height is 8'-0", you need a Rail Extension
Kit. (Figure 3) (See Accessories Order Form, page 19).
C
If door height is taller than 8'-O",you will require a different
rail.
Contact an Genie Customer
Service Representative
at 1-800-
35-GENIE.
CH_iG
DOO_
M_it%[;@H: {/_:E_
Figure 3
Rail Extension Kit
Rail Extension for
8' door
........
\ii7 .......
NOTE
The header is a heavily reinforced section of the wall just
above the top of the garage door opening.
A
B
Find vertical center line of door and header:
Close door.
Measure door width at top.
Mark a point at center of door and on header directly
above door. Draw a center line to connect points.
Find Header Bracket mounting
height
(Figure
4):
(Do not attach Header Bracket).
Raise door, watching
top edge of door and stop door
when its edge reaches its highest point.
Measure distance ("H") from top edge of door to floor.
-
For sectional doors, add 2-1/2" to"H"
Mark a point
on center line. Bottom of Header Bracket will be
installed
here.
-
For one-piece
doors, add 6" to "H" Mark this point on
center line. Bottom of Header Bracket will be
installed
here.
HEADER
SECTIONAL DOOR
H
ONE-PIECE DOOR
........
\ii7 ...
NOTE
C
6
For both types of doors:
- If the ceiling in your garage is so low that there is
not at least a 3" space above the Header Bracket
mountingpoint,
contact a Genie Factory
AuthorizedDealer.
If a door spring is in the way, place the Header
Bracket above the spring. Do Not move the door spring.
WARNING:
Door springs are under extremely high tension and should be
handled ONLY by a trained professional.
Check wall for a stud or a solid header at your mark:
(If checking
a finished
wall, a stud finder may be helpful).
If location
is above Header, a 2"x 6" board must be
screwed to studs beside your mark with at least two Lag
Screws and Flat Washers (not provided).
Transfer your mark to new mounting
board.
HEADER
H ÷ 6"
Figure 4
Find Highest Point of Travel
.........................
L_I N ........................
loading

Este manual también es adecuado para:

Directlift plus 3060