Dometic SPX1200T Instrucciones De Montaje página 11

Juego de montaje para man tgx/tgs (xxl, xlx, xl, lx)
Ocultar thumbs Ver también para SPX1200T:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39
SPX1200T
5. Connect the voltage monitor negative lead (black) to the battery negative
terminal as illustrated.
I
NOTE
Place the fuse holder no more than 0.3 m from the positive terminal of the
battery.
6. Connect the power supply positive lead (red) to the battery positive terminal
as illustrated via a 40 A fuse.
7. Connect the voltage monitor positive lead (red) to the battery positive
terminal as illustrated via a 2 A fuse.
8. Connect the wiring loom to the unit and fix with a cable tie in a suitable
position (fig. b 2.).
6.7
Installing supply lines to the condenser unit
Observe the following instructions when installing the supply lines:
• Also observe the installation instructions for the condenser unit.
• The maximum cable length between the evaporator and condenser unit is
4.20 m (fig. d).
• When installing and bending supply lines, avoid narrow radii. Use a suitable
round object as a bending aid. A radius which is too narrow will buckle the
refrigerant line, and the parking cooler will be inoperable.
1. Shorten any supply line which is not needed by bending a curve.
2. Apply packing compound (fig. d 1) to prevent water entering between the
rear wall of the truck and the clip.
I
NOTE
If you wish to avoid damaging the rear wall of the truck (drilling a hole), you can
also apply the clip using a suitable adhesive. Observe the instructions provided
by the adhesive manufacturer.
3. Fasten the supply lines to the rear wall of the truck using the clips provided
(fig. d).
4. Insert the corrugated piping in the holder provided (fig. d 2).
5. Put the cover on (fig. d 4).
EN
Installation
11
loading

Este manual también es adecuado para:

9600011575