Boiler Decommissioning; Quick Reference Guide - Fire And Safety; End Notes For Installers - Service - Kostrzewa Twin Bio Manual De Uso

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 207
82
10. ... decommissioning | 11. Quick reference... | 12. End...

10. Boiler decommissioning

Most of the boiler components are made of steel and can be
disposed of by returning to an authorised scrap yard. Other
components must be disposed of in accordance with the
relevant regulations.
11. Quick reference guide
– Fire and safety
1. Please read the Operation and Maintenance Manual before
boiler start-up.
2. Do not use solvents, petrol etc. to light a fi re.
3. Do not open live electrical devices to avoid electric shock.
4. Place the required fi re fi ghting equipment in the fuel store
and the boiler room.
5. Prevent unauthorised access.
6. The heating system equipment may be operated by an
authorised and trained personnel only.
7. Check the wiring system and the fl ue system periodically.
8. Do not block the vents.
9. Check the burner operation and the fl ue gas quality, adjust
the burner or analyse fl ue gas as required.
10. Disconnect the power supply (main switch) before
maintenance.
11. Notify your supervisor of any faults.
12. Keep the boiler room clean and tidy.
13. The device may be repaired by trained and authorised
personnel or an authorised service centre only.
14. Use carbon dioxide or dry powder extinguisher only.
Experts in heating
12. End notes for installers
– SERVICE
• Connect the boiler to the hydraulic system by installing
a mixing valve with a boiler circulation pump which ensure
the return water temperature of at least 45°C.
• Before connecting the boiler to the fl ue system, contact the
relevant authorities for approval.
• The compression tank must be connected with the boiler via
a supply duct without any cut-off devices.
User Manual Twin Bio - PLV 09.13
Tabla de contenido
loading

Tabla de contenido