76
7. Installation
7.J. Oats grate installation
1).
1
1
2
2
2).
3).
7.K. Cast iron grates (wood fi ring option)
Starting the boiler in wood fi red confi guration
WARNING!!!
When using wood as fuel in the hopper you must
ensure that the fl ue gas temperature does not exceed
200°C.
Experts in heating
4).
5).
6).
Do not start the boiler if one of the following applies:
1. Set the OFF mode on the control panel – wait for the boiler
to cool
2. Choose fuel type – feed chamber
3. Place additional grates in the boiler
4. Place pieces of paper on the grates
5. Set dry wood pieces on the grates (size M is maximum
fuel level)
6. Set the paper on fi re with matches
7. Close boiler door
8. Set the boiler's panel into ON mode
9. Set the boiler's temperature to 70°C
10. Add more dry wood after a few hours
User Manual Twin Bio - PLV 09.13