KATEK ghost ONE Basic Manual De Instrucciones página 36

Ocultar thumbs Ver también para ghost ONE Basic:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 63
7  Installation
7.
Optional: Insert the SIM card, see
ting the SIM card
(optional).
8.
Strip the insulation from the infrastructure
cable to a length of 25 cm. The minimum
length after the stripped section depends
on the direction from which the infra-
structure cable comes: below, rear (see
figure
2), above (see
figure
9.
If the cable comes from below, run the
cable directly to the housing opening pro-
vided. The freely available cable length
after the stripped section must be 16 cm.
10.
If the cable comes from the rear, position
the cable outlet from the wall level with
the lower right mounting and horizontally
centred with respect to the wallbox hou-
sing.
The freely available cable length after the
stripped section must be 11 cm. See
2.
11.
If the infrastructure cable comes from
above, route the cable as shown. See
figure
3.
The freely available cable length after the
stripped section must be 58 cm.
12.
Pre-drill and remove the designated hou-
sing opening for the infrastructure cable
(top or bottom).
Inser-
7.2 Installing the Wallbox
DANGER
Danger during assembly and installation
If components are damaged during assembly
and installation, there is a risk of serious inju-
ries.
3).
n
Stop any further work.
n
Notify technical service.
ATTENTION
Possible damage to ribbon cable
Carrying out work without due care can damage
the ribbon cable (see
n
Perform all assembly and installation acti-
vities carefully.
1.
Mark the 4 mounting holes on the wall
using the drilling template.
figure
2.
Drill the mounting holes in the wall as mar-
ked.
3.
Insert the plugs for the hanger bolts.
DANGER
Risk of death due to electric shock
Live cables must not be installed at
n
the attachment points where the
fixing screws are fitted.
Note
The plugs must be selected by the instal-
lation engineer using the hanger bolts sup-
plied and the wall condition.
4.
Screw in the hanger bolts so that they pro-
trude at least 6 cm from the wall.
5.
6.
figure
6).
7.
8.
9.
10.
Open up the prepared housing opening for
the infrastructure cable depending on the
cable direction.
Pierce the cable entry grommet (KEL-
SCDP 40) with a slotted screwdriver and
cut to the required size as specified in the
cross-section table using side cutters.
Diaphragm ring
Cable Ø mm
A
10 - 18
B
18 - 22
C
22 - 24
D
24 -26
E
26 -28
F
>28
The designated position for the cable entry
grommet (KEL-SCDP 40) is pre-drilled.
Insert the cable entry grommet (KEL-
SCDP 40) so that the sealing lips enclose
the inside of the rim.
Pull the infrastructure cable through the
cable entry grommet on the rear of the
Wallbox (1). See
figure
4.
Mount the Wallbox on the 4 mounting
bolts using the holes on the rear (2). See
figure
4.
To seal it, place 4 rubber seals and then 4
flat washers on the 4 hanger bolts and
secure each with a nut (with a torque of
3-4 Nm). See
figure
5.
33
loading