Wayne Dalton Lowe's 8000 Instrucciones De Instalación Y Manual Del Propietario página 20

Idiomas disponibles

Idiomas disponibles

18
SECURING DOOR FOR WINDING THE SPRING(S)
See Figure 39 for the following steps.
18a. With the door in the fully closed position, place locking pliers
vertical tracks
and
just above the third track roller
1
2
the garage door from rising while winding spring(s). Ensure that:
• Counterbalance lift cables are secured at bottom corner brackets, See
Figure 13.
• Counterbalance lift cables are unobstructed in their route to cable drums.
• Counterbalance lift cables are correctly installed with 1/2 wrap wound onto
cable lift drums.
• Cable is between cable drum and wall.
• Spring tube is installed correctly.
18b. Review the Winding Spring Turn Chart in Table 2, to determine the number of
spring turns required.
WARNING
FAILURE TO PLACE LOCKING PLIERS ONTO VERTICAL TRACK CAN ALLOW
DOOR TO RAISE AND CAUSE SEVERE OR FATAL INJURY.
CAUTION
TO AVOID POSSIBLE DAMAGE TO YOUR DOOR, THE DOOR MUST BE CLOSED
AND LOCKED WHEN WINDING OR MAKING ANY ADJUSTMENTS TO THE
SPRING(S).
7
6
5
1
Figure 39
1
Left Side Vertical
Track
2
Right Side Vertical
Track
3
Short Stem Track
Roller
4
Locking Pliers
onto both
4
. This is to prevent
3
4
2
3
5
Bottom Section
6
Second Section
7
Intermediate
Section
19
ADJUSTING COUNTERBALANCE LIFT CABLE
See Figures 40 through 42 for the following steps.
19a. Adjust the right side cable drum
faces directly away from the header. Ensure the cam peak
2
tube is vertically oriented.
19b. Loosen the set screw by 1/2 turn. Ensure counterbalance lift cable
aligned and seated in the first groove
the excess cable
.
6
19c. Snug the set screw and then tighten it 1-1/2 turns further. Measure
approximately 6" (152 mm) of cable and cut off excess. Insert cut end of the cable
into the cable drum aperture
7
WARNING
FAILURE TO ENSURE THE COUNTERBALANCE LIFT CABLES ARE SEATED IN
THE FIRST GROOVE OF THE CABLE DRUMS PRIOR TO WINDING SPRINGS,
CAN RESULT IN DOOR FAILURE AND CAUSE SEVERE OR FATAL INJURY.
NOTE: Figures 40 through 42 shows the right side cable drum assembly. Repeat
the process for the left side.
3
6
6"
(152 mm)
Figure 40, Right Side Shown
1
3
2
6
Figure 41, Right Side Shown
20
by rotating the drum until the set screw
1
on the spring
3
of the cable drum. Remove all slack in
5
. Repeat for left side cable drum assembly.
5
1
4
7
5
4
2
is
4
loading

Productos relacionados para Wayne Dalton Lowe's 8000