Mitsubishi Electric CITY MULTI PURY-P-YNW-A Manual De Instalación página 48

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 183
(2) When MA remote controllers are connected
* Move the power jumper from
CN41 to CN40. *
1
* SW5-1: ON *
2
* Leave the power jumper
connected to CN41.
* SW5-1: ON *
2
Shielded cable
Sub remote controller
System controller
*1 When a power supply unit is not connected to the centralized control transmission cable, move the power jumper from CN41 to CN40 on
only one of the outdoor units.
*2 If a system controller is used, set SW5-1 on ALL of the outdoor units to ON.
*3 When a PAR-31MAA is connected to a group, no other MA remote controllers can be connected to the same group.
*4 In an R2 system: BC, BS
In a Hybrid City Multi system: HB, HS
Maximum allowable length of control cables
Transmission cables via outdoor units
Transmission cables
Remote controller cables
*5 When extending the length of the transmission cables to 1000 m (3280 ft), consult your dealer.
WT08432X01
OC
CN41 CN40
*4
BC
(51)
(52)
TB02
TB3
M1 M2 S
M1M2
M1M2 S
TB7
L
3
OC
CN41
*4
BC
(53)
(54)
TB02
TB3
M1 M2 S
M1M2
M1M2 S
TB7
A B
S
L
+ L
+ L
1
2
L
, L
+ L
1
3
m
+ m
, m
1
2
GB-46
L
1
Group 1
Group 3
IC
IC
BS
(01)
(04)
(55)
TB02
TB5
TB15
TB5
TB15
M1 M2 S
M1 M2
S
1 2
M1 M2 S
1 2
A B
MA
L
4
IC
IC
(03)
(02)
TB5
TB15
TB5
TB15
M1 M2 S
1 2
M1 M2 S
1 2
A B
MA
+ L
, L
+ L
+ L
3
4
1
2
6
, L
, L
+ L
4
6
2
6
+ m
+ m
+ m
1
2
3
4
Group 5
IC
IC
*4
(05)
(06)
2
TB5
TB15
TB5
TB15
M1 M2 S
1 2
M1 M2 S
1 2
4
A B
A B
MA
MA
IC
(07)
TB5
TB15
M1 M2 S
1 2
*5
loading