BUOYANCY TUBE – COMMISSIONING
4
5
7
After fixing the internal protective flap on the hull, pull the buoyancy tube gently towards the
forward section in order to send the external protective flap over the forward nose (do not
attach it at this point). Then pull the buoyancy tube towards the aft end.
NOTE
Install the internal rubber guard
6
Fix the internal protective flap
The external protective flap should be fixed
after the buoyancy tube has been inflated
THEN BEGIN INFLATION
Page 15 / 31
E
N
G
L
I
S
H