Zodiac YACHTLINE 360 Manual De Instrucciones página 44

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 63
BUOYANCY TUBE – COMMISSIONING
II-2 INSTALLING THE BUOYANCY TUBE ON THE HULL
NOTE
1
To facilitate the positioning of the buoyancy tube, apply liquid soap (A) to the hull rails.
2
Position the buoyancy tube's (b) bolt rope (a) on the hull's rail.
3
- Pull the buoyancy tube towards the boats stern (Do not forget to guide the upper bolt rope C).
- Repeat for the other side of the buoyancy tube
IF THE BUOYANCY TUBE WAS STORED AT A TEMPERATURE BELOW
0°C / 32°F, LEAVE IT AT 20°C / 68°F FOR 12 HOURS BEFORE
UNFOLDING.
The buoyancy tube is fitted to the hull with the buoyancy tube
C
Page 14 / 31
deflated.
A
B
Tabla de contenido
loading

Este manual también es adecuado para:

Yachtline 400

Tabla de contenido