Zodiac YACHTLINE 360 Manual De Instrucciones página 42

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 63
I -4-3-Lifting:
WARNING
These values are an
example
360 YL
400 YL
WARNING
CAUTION
DESCRIPTION - HANDLING
The lifting sling is available as an option; you must only use an AVON sling
for lifting.
A
(m)
1.25
4'1"
(ft)
(m)
1.25
4'1"
(ft)
All equipment must be unloaded from the boat for lifting or davit
handling.
The self bailer (item 20*) and the drain hole (item 22*) must be open to
evacuate any rain water in the cockpit.
* see chapter I-3 "Location of items"
Page 12 / 31
B
1
3'3"
1
3'3"
No passengers on board while hoisting
C
D
1.45
1.4
4'8"
4'6"
1.45
1.4
4'8"
4'6"
Tabla de contenido
loading

Este manual también es adecuado para:

Yachtline 400

Tabla de contenido