STEP 2: Cabinet Preparation

The range is a free standing unit. If the unit is to be
placed adjacent to cabinets, the clearances shown in
"Installation Clearances" are required. The same
clearances apply to island installations, except for the
overhead cabinets, which must have a space wide
enough to accept the flared island hood.
Any openings in the wall behind the range and in the
floor under the range must be sealed.
The gas and electrical supply should be within the
zones shown in Figure 4 on page 10.
When installing against a combustible surface, a Low
Backguard is optional. A THERMADOR
Backguard must be purchased separately. See STEP 7
for backguard, kits and installation information.
Rear clearance to a combustible surface is zero inches
(see "Installation Clearances" on page 7).
When the range is installed against a combustible side
wall a minimum clearance of 5'' (127 mm) is needed
from the side of the range to the wall.
Always keep appliance area clear from combustible
materials, gasoline and other flammable vapors and
liquids.
The maximum depth of overhead cabinets installed on
either side of the hood is 13" (330 mm).
Do not obstruct the flow of combustion and ventilation
air to the unit.
There is a 36'' (914 mm) minimum clearance required
between the top of the cooking surface and the bottom
of an unprotected cabinet. A 30'' (762 mm) clearance
can be used when the bottom of the wood or metal
cabinet is protected by not less than 1/4'' (6mm) of a
flame retardant material covered with not less than No.
28 MSG sheet steel, 0.015'' (0.38 mm) thick stainless
steel, 0.024'' (0.61 mm) aluminum, or 0.02'' (0.51 mm)
thick copper.
Flame retardant materials bear the mark:
UNDERWRITERS LABORATORIES INC. CLASSIFIED
MINERAL AND FIBER BOARDS SURFACE BURNING
CHARACTERISTICS, followed by the flame spread and
smoke ratings. These designations are shown as "FHC
(FIame Spread/Smoke Developed)." Materials with "O"
flame spread ratings are flame retardant. Local codes may
allow other flame spread ratings. It is the responsibility of
the installer to ensure installation is in accordance with
these ratings.
Installation Instructions

Specifications

Range width
Cutout width
Range height
Depth from rear to
door handle
Cutout depth
Min. clearance to rear
®
combustible wall*
Low
Min. clearance to left
and right side
combustible walls*
Min. clearance to
ventilation hood *
Gas requirements
Gas manifold pressure
Electrical
requirements
Surface burner rating
natural/LP gas
Oven interior width
Oven interior height
Oven interior depth
Overall oven volume
Approximate shipping
weight
* As defined in the "National Fuel Gas Code" (ANSI
Z223.2, Current Edition). Clearances from non-
combustible materials are not part of the ANSI Z21.1
scope and are not certified by CSA.
Description
35
0" (screw head ~ 4 mm)
Non-combustible area overhead
High Altitude Kit for up to 10,100 ft
Natural 5.0'' W.C.P. / Liquid
Propane L/P 10.0'' W.C.P.
See Electrical Requirements
18,000 BTU / 14,000 BTU
15,000 BTU / 11,000 BTU
10,000 BTU / 9,100 BTU
8,000 BTU / 6,000 BTU
Large oven – 25'' (635 mm)
Large oven – 16¼'' (413 mm)
Large oven – 18 '' (467 mm)
30'' Gas
29-15/16" (760 mm)
30'' (762 mm)
'' - 36 ¾'' (911-933 mm)
31 '' (797 mm)
24'' (610 mm)
5'' (127 mm)
30'' (762 mm)
(3,078 m) (included).
information.
4.4 cubic feet
376 lbs (171 kg)