Initial Filling Requirements - Thermo Scientific ThermoFlex Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 26
Section 3
Initial Filling
Requirements
CAUTION
3-20
ThermoFlex
Ensure the reservoir drain plug on the back of the chiller is in place, or the
Riton fitting is closed, and that all plumbing connections are secure.
Before using any fluid refer to the manufacturer's SDS for handling
precautions.
Figure 3-7 Reservoir Cap
The reservoir has a sight tube and ball for easy fluid level monitoring. Slowly
fill the reservoir with clean process fluid through the funnel only, failure to
comply may result in internal spillage.
Note Filling the reservoir above MAX LeVeL fill line will result in a over
flow error (Over Flow) causing the chiller to shut down. Also, fluids expand
when heated.
Since the reservoir capacity may be small compared to your application and
air may need to be purged from the lines, have extra cooling fluid on hand to
keep the system topped off when external circulation is started.
Figure 3-8 Reservoir Sight Tube & Ball
Before replacing the reservoir cap ensure the reservoir sight tube ball
stopper is securely in place.
Replace the reservoir cap by screwing it clockwise. Cap should be hand tight.
Locate and remove the reservoir cap by
unscrewing it counterclockwise.
To prevent the introduction of particulates
into the system, fill with the reservoir bag
filter in place.
MAX
LEVEL
Reservoir Sight Tube & Ball
MIN
LEVEL
Thermo Scientific
Tabla de contenido
loading

Tabla de contenido