Initial Steps; Establishing Connection To Visualization - MR TAPCON 230 Instructions De Montage

Ocultar thumbs Ver también para TAPCON 230:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

7 Initial steps

NOTICE
Maschinenfabrik Reinhausen GmbH 2021
7 Initial steps
Damage to device and system periphery
An incorrectly connected device can cause damage to the device and sys-
tem periphery.
► Check the entire configuration before commissioning.
As soon as the device has powered up and the start screen is displayed, you
will be asked to make the following settings:

7.1 Establishing connection to visualization

A connection to the visualization can be established using two interfaces:
▪ Front interface (for local access)
▪ Optional: Interface X3 on the rear of the device (for access via remote dis-
play, control center etc.)
System requirements
To access the web-based visualization, you need a PC with an HTML5-ca-
pable browser. The display is optimized for the following browsers:
▪ Microsoft® Internet Explorer 11
▪ Google Chrome™
Establishing a connection via front interface
1. Remove the interface cover on the front of the device.
2. Connect the COM-X2 to the CPU-X3 using the supplied patch cable.
Figure 35: Patch cable on the rear
7820658/01 EN
®
TAPCON
230
49
Tabla de contenido
loading

Tabla de contenido