Installation
d. Attach upper recirculation pipe (long
end on top) to the hose connector at
the shell recirculation inlet. Do not
secure clamps.
e. Position upper recirculation pipe so that
it is parallel to the cage wrap surface.
Slide cage wrap bracket approximately
6 inches from the rear of the cage wrap
and mark the cage wrap with a
permanent marker through the hole on
the cage wrap bracket.
f. Remove the upper recirculation pipe
and drill a 1/16-inch hole in the cage
wrap on the marked spot.
g. Fasten the cage wrap bracket to the
cage wrap by securing with a sheet
metal screw, included in the kit,
through the 1/16-inch hole.
h. Position the upper recirculation pipe by
sliding it through the cage wrap bracket
and inserting it into the hose connector
and the rubber grommet in the
plumbing bracket at the shell
recirculation inlet.
i. Tighten the clamps on the hose
connector at the shell recirculation
inlet. Tighten the securing bolt on the
cage wrap bracket. Ensure that the
upper recirculation pipe is tight and
fully secured.
j. Align the lower recirculation pipe to
the upper recirculation pipe and the
pump outlet. Ensure that the Premium
Wet Clean Module can be positioned so
that the flex hose from the left drain to
the canister/filter bends comfortably.
40
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
If the flex hose appears to be crimped
or stretched excessively, flip the lower
recirculation pipe around and reposition
the Premium Wet Clean Module until
the flex hose bends comfortably.
k. Slide one 1-1/2-inch black connector
(with clamp grooves), included in the
kit, onto the upper recirculation pipe
side of the lower recirculation pipe.
l. Assemble the other 1-1/2-inch black
connector (with clamp grooves),
included in the kit, to the pump outlet.
m. Position the lower recirculation pipe
between the upper recirculation pipe
and the pump outlet. Verify alignment.
Secure the lower recirculation pipe
to the pump outlet by tightening the
clamps on 1-1/2-inch black connector.
n. Slide the other 1-1/2-inch connector
between the upper and lower
recirculation pipes. Tighten the
connector clamps.
o. Verify that all pipe connections are tight
and fully secure.
Verify operation with Control Function Test,
which follows.
F232084