Alliance Laundry Systems UW35PV Instalación/Mantenimiento página 24

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation
5. Fill the space between the washer-
extractor base and the floor with a good
quality non-shrinking machinery grout to
ensure a stable installation. Grout
completely under all frame members.
(Remove front panel and expanded metal
back panel to gain access to all frame
members.) See Figure 6. Force grout under
machine base until all voids
are filled.
6. Remove the spacers carefully, allowing the
machine to settle into the wet grout.
7. Before grout sets completely, make a drain
opening in the rear of the washer-extractor
grouting with a stiff piece of wire; this
opening should be approximately 1/2 inch
(13 mm) wide to allow any surface water
build-up under the base of the machine to
drain away. Do not omit this step.
8. Position the mounting bolt washers and
locknuts on the anchor bolts and
fingertighten locknuts to machine base.
9. After the grout is completely dry, tighten
the locknuts by even increments – one
after the other–until all are tightened
evenly and the washer-extractor is fastened
securely to the floor.
Check and retighten the locknuts after
Note:
five to ten days of operation and every
month thereafter.
22
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
F232084

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Uw80pvUw125pvUw60pvUw100pv

Tabla de contenido