Starting a Job
Punching and Stacking
For punching and stacking the 11" edge in the GBC Stacker without a
n
Bypass installed, follow the procedure below.
For punching and stacking the 11" edge in the Xerox High Capacity
n
Stacker, go to Starting a Job for Bypassing to a Downstream device
(Page 2-20.)
For punching and stacking the 8.5" edge, go to Starting a Job for
n
Bypassing to a Dowstream device (Page 2-20.)
To prepare for starting a printing job and sending it to the FusionPunch II,
perform the following procedures.
1
Set up the FusionPunch II according to the job requirements (For
FusionPunch II setup, refer to the Getting Started section, On-line /
Off-line).
2
From the DocuSP Print Services screen, open the Printer Manager
window and click on the Finishing Icon.
2-14
Figure 2-10: The Finishing Window
General Procedures