Start command during the opening phase
This menu allows fixing the control unit conduct in case it receives a
Start command during the opening phase.
PAUS
The gate stops and goes to pause.
ChiU
The gate immediately starts closing.
no
The gate go on with the opening phase (command is ignored).
Select option PAUS, to set up the "step-by-step" operation logic.
Select option 'no', to set up the 'always open' operation logic.
Start command during the closing phase
This menu allows fixing the control unit conduct in case it receives a
Start command during the closing phase.
StoP
The gate stops and its cycle is considered as finished.
APEr
The gate opens again.
Select option StoP, to set up the "step-by-step" operation logic.
Select option APEr, to set up the 'always open' operation logic.
Start command during the pause
This menu allows fixing the control unit conduct in case it receives a
Start command when the gate is open during its pause phase.
ChiU
the gate starts closing.
no
command is ignored.
PAUS
The pause time is reset (Ch.AU)
Select option ChiU, to set up the "step-by-step" operation logic.
Select option 'no', to set up the 'always open' operation logic.
ATTENTION: Apart from selected option, the start command lets
the gate close if it has been stopped by a stop command or if the
automatic closing was not enabled.
Pedestrian Start during the partial opening phase
This menu allows fixing the control unit conduct in case it receives a
Pedestrian Start command during the partial opening phase.
PAUS
The gate stops and goes to pause.
ChiU
the gate immediately starts closing.
no
the gate goes on with the opening phase (command is ignored).
WARNING: a Start command in any phase of partial opening will
cause the total opening; the Start Pedestrian command is always
ignored during a total opening.
42