After adjusting all the above settings and connecting the gases to the gas console, carry out a gas TEST.
Press the TEST button shown in Fig.4.3 to enter the screen where the gas tightness test can be carried out.
Press the button for the gas to be tested: The machine firstly carries out a purge, then the pipes are filled with the
gas and the GAS INLET solenoids and the solenoids in the valve console are deactivated. If no leaks are identified
during the test period, check marks appear under each channel. Conversely, if leaks are detected from one or more
channels, a red cross appears beneath the corresponding channel.
A tightness test must be carried out periodically on all gas types to check for any leaks in pipes, from the pipe
inlet on the rear of the gas console to the valve console inlet.
CNC/Robot parameters
The following figure shows the spot, cut or mark setting parameters (SPOT/CUT/MARK), according to the previously
selected parameters (CUT in fig. 4.6)
In particular, the cutting and marking parameters relating to the selected Material, Gas, Thickness and Current and
also present in the cutting charts attached to the torch are displayed:
♦
Arc Voltage
♦
Cutting Speed
♦
Cutting Height
♦
Ignition Height
110/128
Fig. 4.5
Fig. 4.6