Operative Cycle - Tecno-gaz ONYX B 7.0 Manual Tecnico

Ocultar thumbs Ver también para ONYX B 7.0:
Tabla de contenido
ENGLISH

OPERATIVE CYCLE

PHASE 1: FIRST VACUUM AND WATER INLET (VACUUM 1)
As a first operation, the autoclave activates the vacuum pump (F) and the status of EV5
change in on. Thanks to the change of EV3 in on, the air is suctioned from the chamber
of sterilization. During the phase of reaching of vacuum, EV6 activates and deactivates
for cooling and for cleaning the surface of the membranes of the vacuum pump (the
average time of this phase is about 2 / 3 minutes).
EV2
EV3
EV4
EV5
EV6
EV7
OFF
ON
OFF
ON
ON (3 volte agli intervalli -0.2bar /
-0.4bar / -0.6bar)
OFF
Once the negative pressure o -0.86 bar is reached, EV3 closes (off), the vacuum pump
stops working and the valve EV4 opens (on) to enable the inlet of water into the chamber
from the clean water tank (E). The quantity of water is read by the flowmeter; when the
correct quantity of water is reached, EV4 closes (off).
EV2
EV3
EV4
EV5
EV6
EV7
OFF
OFF
ON
ON
OFF
OFF
WATER TABLE INLET
Quantity of water for phase: ~290ml.
Total quantity of water: ~290ml.
20

Hide quick links:

Tabla de contenido
loading

Tabla de contenido