Fuse replacement
-To prevent electric shock, shaken by
arcing or damage to person or the meter,
use only the specifi ed fuse according to
the following procedure.
1. Turn the meter off and remove all
connections from the same.
2. Remove the two rubber bands and the
screws from the deck; separate meter
cover.
3. Remove the fuse arm and install a
new one with the same specifi cations
(F10AL250B) of the sample; make sure
the fuse is fi rmly attached to the arm.
18
18