Application Of Burner To Boiler - baltur TBL 85P DACA Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

APPLICATION OF BURNER TO BOILER

HEAD UNIT ASSEMNLY
A) Adjust the position of connector flange 5 by loosening the
screws 6 so that the combustion head penetrates the advised
amount into the combustion chamber as recommended by the
generator's manufacturer.
B) Position the seal insulation 3 on the tube unit inserting cord 2
between flange and seal.
C) Fasten the Combustion Head unit 4 to the boiler 1 by means
of the stud bolts, washers and the nuts provided 7.
Note:Competely seal the space between the tube unit of the
burner and the hole in the refractory panel using suitable ma-
terials to do so.
ASSEMBLYOFVENTILATION SYSTEM
A) Position the half-hinge on the burner scroll in line with those
on the combustion head assembly.
B) Put the hinge pin 10 in the position considered most suitable.
C) Connect the cable switch on to thecorresponding electrodes,
close the hinge, locking the burner by means of screws 11.
COMPLETING BURNER SETUP
1)Remove the protective yellow caps from the connectors benea-
th the combustion head and close to the solenoid valves.
2) Connect the 12 light oil pipes provided with the burner to their
corresponding connectors, making sure they are properly sea-
led.
36 / 96
0006081053_200801
E
N
G
L
I
S
H
Tabla de contenido
loading

Este manual también es adecuado para:

Tbl 105p dacaTbl 130p dacaTbl 160p dacaTbl 85pTbl 105pTbl 130p ... Mostrar todo

Tabla de contenido