4. OpErAtIOn
Step 1: After the module is installed and the wiring connected, energize the drive;
Step 2: Check to see if the module has been correctly identified by the control:
FDxx (IOA-01) or FAxx (IOB-01);
Step 3: Program the analog and digital inputs and outputs according to the needs
of the application using the programming manual of the CFW11 as a
reference.
6