RPB Z-Link Manual De Instrucciones página 24

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

SETUP AND USE - Z-LINK+
FIGURE 15.5
To remove the Welding Visor from the
Z-LINK
, pull the sides of the Welding Visor
®
out until the connection sockets snap out of
the Pivot Pins in the Z-LINK
be done while wearing the Z-LINK
STORAGE
Store in a cool dry place between -10°C to +45°C (14°F to 113°F) <90%rh.
After cleaning:
FIGURE 16.1
24
CONTINUED
. This can also
®
.
®
FIGURE 15.6
If the Welding Visor is not going to be used
again for a while, the socket caps can be
snapped back into the Pivot Pins to keep the
area free of debris.
After use:
FIGURE 16.2
Tabla de contenido
loading

Tabla de contenido