Advance Planning; Before You Begin - Thermador PROFESSIONAL VCIN JP Serie Manual De Instalación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Advance Planning

Before You Begin

Parts Included
1 – 1000 CFM integral blower
(VC
1 – Metal transition with backdraft
damper
2, 3, or 4 – Stainless steel baffle
filters (depending on model size)
2 – Filter spacers
2 or 3 – Grease trays (depending on
model size)
1 – Liner (
4 – Side trims (VC
only)
2 or 4 – Halogen lights (installed)
1 – Remote blower adaptor
1 – Fastener assortment
Use & Care Guide, Installation Manual, and Registration
Card
I
BxxJP models only)
VCIBxxJP
models only)
I
NxxJP models
Before installing, turn power OFF at the service panel.
Lock service panel to prevent power from being turned
ON accidentally.
Tools and Parts Needed
VCINxxJP
Blower motor (
Ductwork as necessary (style varies, see Table 4)
Additional sheet metal screws (as necessary for
ductwork installation)
1" (25.4 mm) Strain relief
Aluminum tape (DO NOT use duct tape)
1/2" (13 mm) Conduit if required (follow local codes)
Framing material (as necessary for framework)
Circular saw or jigsaw
Tape measure
Phillips head screwdriver
Protective work gloves
Available Accessories
LINER236
– 36" Custom Hood Liner (
only)
LINER248
– 48" Custom Hood Liner (
only)
LINER254
– 54" Custom Hood Liner (
only)
VCI2REMKS
– Remote Control
Remove all tape and packaging before using the
appliance. Please, recycle the packaging
material, as all THERMADOR
packaging material is recyclable. Never allow
children to play with packaging material.
CAUTION:
models only, see Table 5)
VCIN
models
VCIN
models
VCIN
models
®
appliance
English 3
Tabla de contenido
loading

Tabla de contenido