VCIBxxJP Installation
Procedure
To avoid electrical shock hazard, before installing, switch
power off at the service panel and lock the panel to
prevent the power from being switched on accidentally.
The hood weighs at least 60 lbs; therefore, it
requires at least two people to lift it safely.
Hidden surfaces may have sharp edges.
Use caution when handling the appliance.
Failure to do so may result in property
damage or personal injury.
1. Turn power OFF at the service panel. Lock service
panel to prevent power from being turned ON.
2. Prepare ductwork
a) See "Ductwork Preparation" on page 7.
b) Install metal transition with backdraft damper so
that the flap opens up toward the ceiling. If
necessary, install thermal break and additional
backdraft damper (refer to "Assembly of the
Transition" on page 9).
3. Build housing framework
a) Refer to "General Information" on page 4 for the
applicable model dimensions.
b) Refer to "Installation Preparation" on page 6 for
clearance specifications.
c) Build housing framework for applicable model
according to dimensions in "Preparing VCIBxxJP
Housing Framework" beginning on page 23.
4. Install blower motor
a) Refer to "Blower Motor Installation" beginning on
page 11.
English 26
WARNING:
CAUTION:
5. Hood liner installation
a) Slide the liner onto the hood (Figure 34).
b) Hold liner flush to the bottom of the housing.
Secure the liner to the hood with eighteen (18) x ½"
(12.7 mm) screws, as indicated in Figure 35 and
Figure 36.
Figure 35: VCIB Secure Liner Sides
Figure 33: VCIB Liner
Figure 34: VCIB Liner Installation
½" (12,7 mm)
x3 cada lado