Installation - Blaupunkt 5CB 28010 Montaje Y Modo De Empleo

Tabla de contenido
Page 46
Start-up

Installation

Parts for the installation
(18)
4× slider for attachment
to the appliance door
(19)
4× cover for slider (18)
(20)
4× drag rail for
attachment to the
cabinet door
(21)
4× cover for drag rail
(20)
Built-in cabinet and ventilation
The built-in cabinet must meet the following requirements:
Installation
dimensions:
(22)
2× cover for centre
hinge
(23)
2× screw, long
(24)
27× screw, short
(25)
1× sealing strip
Ventilation cross-
section:
25 mm
1,036.5 mm
52 mm
671.5 mm
min.
200 cm
2
min.
200 cm
2
Tabla de contenido
loading

Tabla de contenido