Quarterly Maintenance - Tecno-gaz Hydra EVO Instrucciones De Uso

Ocultar thumbs Ver también para Hydra EVO:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 67
ENGLISH
11
CAUTION:
Disconnect always the main supply before each technical intervention
11.1 Daily routine maintenance
Clean the seal on the door
the gasket using a wet cloth or the soft part of the supplied sponge.
This cleaning operation must be carried out to remove possible dirt which can cause a
pressure loss in the sterilisation chamber and a possible seal cut.
Check the water level in the tank (see paragraph 8).
11.2 Weekly routine maintenance
To remove the deposits on the chamber floor, clean with the abrasive part of the supplied
sponge after removing the tray-holder.
To moisten the sponge, only use distilled or demineralized water.
Empty the water tank (see paragraph.9).

11.3 Quarterly maintenance

Lubricate the hinges and the closing pin with silicon oil.
Adjusting the door
turn it counterclockwise Photo F to increase the pressure of the gasket on the chamber.
14
MAINTENANCE
1A
and on the outer edge of the sterilisation chamber sealing
1A
:If the handle
2A
1A
Turn it clockwise to decrease the pressure.
is too frail while closing and blocking the door,
Photo F
2A
Tabla de contenido
loading

Este manual también es adecuado para:

Hydra evo plus2066-s-22066l-s-2

Tabla de contenido