Electrical Work - Mitsubishi Electric City Multi PLFY-WP-VBM-E Serie Manual De Instalación

Ocultar thumbs Ver también para City Multi PLFY-WP-VBM-E Serie:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Electrical
or
C
A
F
B
D
E
K
Fig
Fig
G
-
L N
M1 M2 S
1 2
TB2
TB5
TB15
-2
Indoor unit (Fig
- )
1. Remove the electrical wiring service panel.
2. Remove the electrical box cover.
3. Remove the MA Remote controller terminal cover.
4. Wire the power cable and control cable separately through the respective wiring
entries given in the diagram.
Do not allow slackening of the terminal screws.
Leave excess cable so that the electrical box cover can be suspended below the
unit during servicing. (Approx. 5 to 1
A Entry for remote controller cable
B Entry for power and control cable
C Clamp
D Electrical box cover
E Service panel for electrical wiring
F Temporary hook for electrical box cover
G MA Remote controller terminal cover
H Power supply terminals (with earth terminal) (L, N,
I Transmission terminals (M1, M2, S)
J MA Remote controller terminal (1, 2)
K Secure with the clamp
2 Po er suppl
iring
Wiring size must comply with the applicable local and national code.
Install an earth longer than other cables.
Power supply codes of appliance shall not be lighter than design 6 245 IEC 53 or
6 227 IEC 53.
A switch with at least 3 mm contact separation in each pole shall be provided by
the air conditioner installation.
Fig
-2
A Ground-fault interrupter
B Local switch Wiring breaker
C Indoor unit
D Pull box
Warning:
Ne er splice the po er ca le or the indoor-outdoor connection ca le other ise
it
a result in a s o e a re or co
mm)
)
unication ailure
Tabla de contenido
loading

Tabla de contenido