Checks Prior To Operation; Battery Connection - GENERGY Cervascan Instrucciones De Uso

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4 Checks prior to operation:

4.1 Battery connection.

Check that the engine switch is in
"OFF" or "0" position.
If you have any doubts to identify the
engine switch check chapter 3.1
PANEL DE CONTROL.
Loosen the support fastening bolts for
the battery, extract it and place it on a
leveled and secure surface.
NOTE: Respect the cable polarities, connect the red cable (+) to the red
terminal (+) of the battery and the black cable (-) to the negative (-) of the battery.
NOTE: Extreme precautions so as to not make unwanted contact with the
battery terminals and cables, among them or against a metallic part of the
machine.
FASTENING BOLTS
35
BATTERY
Tabla de contenido

Solución de problemas

loading

Tabla de contenido