DAB E.sybox Instrucciones Para La Instalación Y El Mantenimiento página 103

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 560
9 - PARTICULAR INSTALLATIONS
9.1 - Inhibiting self-priming
The product is made and supplied with the capacity of being self-priming.
With reference to par. 6, the system is able to prime and therefore oper-
ate in whatever installation configuration chosen: below head or above
head. However there are cases in which the self-priming capacity is not
necessary, or areas where it is forbidden to use self-priming pumps.
During priming the pump obliges part of the water already under pressure
to return to the suction part until a pressure value is reached at delivery
whereby the system can be considered primed. At this point the recircu-
lating channel closes automatically. This phase is repeated each time the
pump is switched on, even already primed, until the same pressure value
that closes the recirculating channel is reached (about 1 bar).
When the water arrives at the system intake already under pressure
(maximum allowed 2 bar) or when the installation is always below head,
it is possible (and mandatory where local regulations require it) to force
the closure of the recirculating pipe, losing the self-priming capacity. This
obtains the advantage of eliminating the clicking noise of the pipe shutter
each time the system is switched on.
To force closure of the self-priming pipe, proceed as follows:
1 - disconnect the power supply;
2 - empty the system (unless you decide to inhibit self-priming at the
first installation);
3 - remove the drainage cap anyway, taking care not to drop the O-
ring (Fig.19);
4 - with the aid of pliers take the shutter out of its seat. The shutter
will be extracted together with the O-Ring and the metal spring with
which it is assembled.
5 – remove the spring from the shutter; insert the shutter in its seat
again with the respective O-Ring (side with gasket towards the inside
of the pump, stem with cross-shaped fins towards the outside);
6 – screw on the cap after having positioned the metal spring in side
so that it is compressed between the cap itself and the with cross-
shaped fins of the shutter stem. When repositioning the cap ensure
that the respective O-Ring is always correctly in its seat.
7 - fill the pump, connect the power supply, start the system.
3
4
5
6
GB
ENGLISH
Figure 19
103
Tabla de contenido
loading

Tabla de contenido