Installing Supply Lines To The Condenser Unit (Spx1200Tonly); Fixing The Cover Frame - Dometic COOLAIR RTX 1000 Instrucciones De Montaje

Juego de montaje para montaje universal 2 (fijación de horquillas)
Ocultar thumbs Ver también para COOLAIR RTX 1000:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 50
RTX1000/2000, SPX1200T
7.8
Installing supply lines to the condenser unit
(SPX1200Tonly)
Observe the following instructions when installing the supply lines:
Also observe the installation instructions for the condenser unit.
The maximum cable length between the evaporator and condenser unit is
4.20 m (fig. d).
When installing and bending supply lines, avoid narrow radii. Use a suitable
round object as a bending aid. A radius which is too narrow will buckle the
refrigerant line, and the parking cooler will be inoperable.
➤ Shorten any supply line which is not needed by bending a curve.
➤ Apply packing compound (fig. d 1) to prevent water entering between the
rear wall of the truck and the clip.
I
NOTE
If you wish to avoid damaging the rear wall of the truck (drilling a hole), you can
also apply the clip using a suitable adhesive. Observe the instructions provided
by the adhesive manufacturer.
➤ Fasten the supply lines to the rear wall of the truck using the clips provided
(fig. d).
➤ Insert the corrugated piping in the holder provided (fig. d 2).
➤ Put the cover on (fig. d 4).
7.9

Fixing the cover frame

The outlet unit should be flush with the cover frame when installed (fig. c).
➤ Trim the cover frame to fit the vehicle.
A
NOTICE!
Tighten the screws carefully in order not to damage the cover frame.
➤ Fix the cover frame in place as illustrated (fig. c).
EN
Installation
13
Tabla de contenido
loading

Este manual también es adecuado para:

Coolair rtx 2000Coolair spx 1200t

Tabla de contenido