LEGRAND KEOR SPE TOWER Manual De Instalación Y Del Usuario página 46

Ocultar thumbs Ver también para KEOR SPE TOWER:
Idiomas disponibles
  • ES

Idiomas disponibles

4 Operation
4.5
Battery test
It is possible to execute a manual battery test if the UPS is working in normal mode and the battery
is fully charged.
Press and hold the
button for 3 seconds and release it after you hear one beep: the UPS will
switch to battery mode and perform a 10-second battery test. After that, UPS will return to line
mode.
If the test result is ok, the display will show PAS for 7 seconds, then return to the previously viewed
data.
If the test result is abnormal, the display will show FAL for 7 seconds, then return to the previously
viewed data. The no-battery/ battery replacement icon (
) will flash until the ON/OFF button
(fault clear) is pressed.
In case of attempting to perform a battery test while the UPS is running in battery mode, the dis-
play will show noP for 7 seconds, then return to the previously viewed data.
46
loading

Este manual también es adecuado para:

3 110 603 110 613 110 623 110 633 110 64