LaCimbali M26 Uso E Instalacion página 57

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 155
C version / DT version without display
CAREFULLY PAY ATTENTION TO THE
SEQUENCE FOR ACTIVATING THE SWITCHES
(1) AND (1A).
1
1
Press the luminous main switch (1) into position
related indicator light switches on and the key also light up.
If the water level in the boiler is lower than the minimum
restored pressure in the manometer-pump.
reached at the time.
Heating is completed when the boiler gauge indicator (19) remains stable in the P green area.
button (9
02_M26_UNICO_EU_2314.indd 11
02_M26_UNICO_EU_2314.indd 11
OFF
ON
2
ONLY AFTER
the
completed should you press the light switch that
activates the resistance (1A) into position
indicate light switches on and the heating phase begins.
Wait until the operating pressure (approx. 1.2 bar) appears
on the manometer (19).
At this point, the machine is ready for use.
(21
11 EN
9
19
21
1
1A
1A
9) to stop dispensing.
P
the related
07/04/2023 12:05:00
07/04/2023 12:05:00
loading