VITO PRO POWER VIGI1250 Manual De Instrucciones página 50

Idiomas disponibles

Idiomas disponibles

The maintenance schedule includes routines, inspection procedures and simple maintenance processes using basic tools
required to work on the generator. Other more complicated maintenance tasks or those requiring special tools should be
performed by qualified technicians or by technical assistance.
The maintenance schedule included in this instruction manual is based on normal working conditions. If the generator is
used in severe conditions such as overload, overheating, abnormal humidity conditions or too much dust, consult the dealer
in search for recommendations for your specific needs.
Failure to follow the maintenance schedule and precautions may result in injury to the user or death.
Always follow the procedures and precautions in the instruction manual.
Intervention
Check the engine oil level
Change the engine oil
Verificar
Check air filter cleaning
Clean air filter
Replace air filter
Verificar
Clean carburetor purge valve
Clean and adjust spark plug
Change spark plug
Clean spark arrester
Clean tank, fuel tank filter
Check the idle speed
Check/adjust valve gap
Check fuel circuit
Check combustion chamber
Clean cylinder head and piston
(1) Perform more frequent maintenance works when the generator is used in dusty areas.
(2) These items should be serviced by the service dealer unless you have the appropriate tools and mechanical knowledge.
1st month
Every 3 month
or 20
or 50 hours
hours



(1)
Every 2 years (replace if necessary) (2)
Every 6 months or
100 hours






After 500 hours (2)
< 225cc, every 125 hours
≥255cc, every 250 hours (2)
Every year or
300 hours

(2)
(2)
loading

Este manual también es adecuado para:

Pro-power vigi2000